Coal mineral sizer
FP Coal mineral sizer is mainly crushing the coal for the primary and secondary crushing in the industries of coal mining, power generation station, c
Product Details
FP Coal mineral sizer is mainly crushing the coal for the primary and secondary crushing in the industries of coal mining, power generation station, coal washing plant, metallurgy,etc. If the crushing system adopting the device of iron and wood removal, the raw coal do not need sieving, but directly crushing, by which it will simplify the coal crushing process, reduce the factory height, reduce the building cost and producing cost for coal handling plant and coal power plant.

Features
1. High capacity. The capacity could up to 20000t/h. And no fine powder product.
2. Large discharged open, material discharged easily, suitable to crush all dry, wet, sticky ores and materials.
3. Easy operation and simply maintenance. It is simple to change the tooth plate and tooth rings. It is convenient to lubricate and maintenance.
4. Low energy consumption. FP mineral sizer adopt the most reasonable crushing principle. Crushing the materials and ores by the force of shearing and splitting.
Product Specifications
| Primary Crushing | FP50series | FP50/80 | FP50/120 | FP50/160 | FP50/200 |
| FP63series | FP63/150 | FP63/200 | FP63/240 | FP63/300 | |
| FP75series | FP75/150 | FP75/200 | FP75/300 | ||
| FP100and above series | FP100/150 | FP100/200 | FP100/300 | FP130 | |
| Secondary Crushing | FP50series | FP50AS | FP50AM | FP50AL | |
| FP63series | FP63AS | FP63AM | FP63AL | ||
| FP80series | FP80AS | FP80AM | FP80AL | FP80AKL | |
| FP100series | FP100AS | FP100AM | FP100AL | FP100AKL |
NOTE: Capacity figures are based on general throughput of medium hardness materials. Actual performance may vary depending on feeding size, rock types and water content.
Installation & Service Process
Foundation Drawing
Within 3 days after signing
Professional engineers provide customized foundation drawings based on your site conditions.
Installation & Commissioning
10-15 days
Two experienced engineers provide on-site installation guidance and equipment commissioning.
Operator Training
2-3 days
Comprehensive training covering both theory and hands-on practice for your team.
After-Sales Support
24/7 Technical Support
- Video diagnosis within 2 hours
- Spare parts dispatched within 48 hours
- On-site engineer within 7 days (major countries)
Frequently Asked Questions
Get a Quotation
Please fill in the form below (* are required) to send us a brief message, we will reply to you within 12 hours/provide you with the latest quotes.
SERVICE PROMISE
Senior technical engineers provide you with customized solutions and professional installation services to effectively solve your problem in after-sales.


